Masters week puts more than 200,000 visitors on Augusta’s restaurants at once. Protect-All gives kitchens, cafeterias and gyms a seamless, slip-resistant floor that is ready for the rush.
Augusta’s restaurants and caterers live by the calendar. The Masters brings more than 200,000 visitors every April, and kitchens along Broad Street, the Riverwalk and Washington Road have to be ready for it. The worst time to discover a failing floor is the week before the tournament, so the best time to replace it is well ahead.
The city is also a major medical and military center. The Medical District around Augusta University and the Medical College of Georgia, plus Fort Gordon’s roughly 29,000 jobs, mean large cafeterias, dining facilities and fitness spaces that run every day.
Food service in Augusta is inspected by Richmond County Environmental Health in the East Central Health District, under Georgia’s Food Service Rules.
Typical projects in the Augusta and Aiken area.
Restaurant and catering kitchens that need to be ready for peak weeks.
02Walk-in cooler and freezer floors.
03School cafeterias, serving lines and locker rooms.
04Gyms and training facilities.
05High-traffic entrances where rain gets tracked in.
06Vet clinics and kennels.
We walk the space, measure, check the slab or subfloor and note drains, thresholds and equipment that has to move.
You get a written scope: install system, color, cove base, drain rings, schedule and price. No guesswork on install night.
Our factory-trained crew preps the substrate, sets Protect-All in urethane adhesive and welds the seams. Most kitchens are scheduled around closed hours.
Rapid Weld seams take foot traffic in about 20 to 30 minutes; the adhesive reaches normal traffic in roughly 12 hours.
Not sure if you are in range? See the full Multi Tech Flooring service area.
Tell us about your space. We will walk the site, check the substrate and give you a clear scope, schedule and price.