☎ (678) 541 0249    ✉ info@multitechfinishes.com
Protect-All Flooring logo
Commercial flooring installation

Installed right the first time

A commercial floor is only as good as its installation. Our crews are trained on Protect-All systems, adhesives and welding, and we handle everything from substrate prep to the last drain ring.

  • Factory-trained crews
  • Substrate prep included
  • Scheduled around your hours
NFSICertified high-traction (matte finish) by the National Floor Safety Institute
1/4″Solid recycled PVC with fabric-strand reinforcement
90%+Pre-consumer recycled content, made in the USA
10 YRLimited material warranty, plus up to 3 years on our installation
Why the installer matters

The warranty depends on the install

Protect-All carries a 10-year limited manufacturer warranty against manufacturing defects, but that warranty can be voided by non-approved adhesives or an installation that does not follow the manufacturer’s instructions. The Heavy-Duty Commercial and Commercial installation systems require a factory-trained installer.

That is the difference between a floor that lasts and one that lifts at the seams in a year. We test the substrate, prepare it properly, use the approved adhesives and weld every seam to specification.

  • Concrete tested for moisture and pH before we start
  • Cracks, dips and old adhesive corrected, not covered up
  • Approved urethane adhesive, rolled for full contact
  • Seams chemically (Rapid Weld) or heat welded
  • Integral cove base and stainless drain rings where required
  • Final walk-through and care instructions for your staff
Installation systems

Four ways Protect-All goes down

SystemHow it is installedTypical use
Heavy-Duty CommercialFull adhesive, welded seams, cove base and drain ringsCommercial kitchens, walk-ins, wash-down areas
CommercialFull adhesive with welded seamsHigh-traffic commercial and institutional floors
Non-WeldedAdhered sheets without welded seamsLighter-duty areas without wash-down
Loose LayNo adhesive; sheets or interlocking tilesGym floor covers, temporary and removable floors

Systems per Protect-All installation guidance. We recommend the right one after seeing your space.

Process

What installation day looks like

Site assessment

We walk the space, measure, check the slab or subfloor and note drains, thresholds and equipment that has to move.

Clear scope

You get a written scope: install system, color, cove base, drain rings, schedule and price. No guesswork on install night.

Install

Our factory-trained crew preps the substrate, sets Protect-All in urethane adhesive and welds the seams. Most kitchens are scheduled around closed hours.

Back to work

Rapid Weld seams take foot traffic in about 20 to 30 minutes; the adhesive reaches normal traffic in roughly 12 hours.

Site requirements

Getting the space ready

Good installs start with good conditions. The manufacturer calls for the HVAC to run at 68 to 80°F for seven days before installation, and for concrete to meet specific strength, moisture and pH limits. We check all of this during the site assessment, so there are no surprises on install night.

If equipment has to move, we plan it with you. If product has to come out of a walk-in, we schedule around your deliveries. And if your space can only close for a night or two, we phase the work.

FAQ

Commercial Flooring Installation questions

How long does commercial flooring installation take?
Many kitchens and walk-ins are done overnight or across a few nights. Rapid Weld seams take foot traffic in about 20 to 30 minutes, and the adhesive reaches normal traffic in roughly 12 hours. Larger facilities are phased.
Do you remove the old floor?
When it needs to come out, yes. We handle demolition and disposal. Sound tile can sometimes stay in place, which saves time and money.
Are you licensed and insured?
Ask us for our current insurance certificates and credentials for your bid or vendor packet.
Do you guarantee your workmanship?
Yes. Ask about our installation workmanship coverage when you receive your quote; it is in addition to the manufacturer’s material warranty.

Book your installation walk-through

Tell us about your space. We will walk the site, check the substrate and give you a clear scope, schedule and price.